Norfolk Southern will be modifying the bridge abutments and replacing the superstructure on this bridge over the next year. Two long-term closures of Madison Avenue (between S. Bever Street and S. Buckeye Street) are planned during this work; the first taking place from October 28th through the end of January, and the second taking place from August 2025 through October 2025.